Substation and Grid Station Design in Abu Dhabi
Design, approvals and site supervision for 11kV to 400kV substations and grid stations in Abu Dhabi and Al Ain, for TAQA transmission and distribution.
National Consulting Office for Engineering (NCO) designs the buildings and site works of electrical substations and grid stations in Abu Dhabi, from 11kV and 33/11kV primary substations to 132kV, 220kV and 400kV grid stations. We work for the contractors delivering TAQA Transmission and TAQA Distribution projects in Abu Dhabi city, Al Ain and the islands.
A substation is a building that protects high-voltage equipment for decades. We design its layout, structure, ventilation and drainage around the switchgear and transformers, coordinate with the utility and the authorities, and follow it through permits to completion.
What we deliver
Architectural design and layout
Station buildings, switchgear and control rooms, cable basements and transformer bays, laid out around the electrical design.
Structural engineering
Foundations, transformer plinths, firewalls and the building structure.
Electrical design and power distribution
Electrical design for the station and its distribution, coordinated with the main equipment.
HVAC, drainage and firefighting
HVAC for equipment rooms, drainage, water supply and storm water, and firefighting systems with fire pump rooms.
Approvals and stakeholder management
NOCs and building permits, and coordination with the utility and the authorities through to completion.
BIM
BIM models for design coordination where the project calls for them.
Selected projects
14 projects in our portfolio

Lightening Project
Abu Dhabi
Client: Jan De Nul (End client ADNOC)

400KV Grid Station in ICAD 4
ICAD 4, Mussafah, Abu Dhabi

220/33kV Ajban Grid Station
Abu Dhabi, United Arab Emirates
Client: L&T/TAQA Transmission

220/33kV Grid Station Volta
Abu Dhabi, United Arab Emirates
Client: Al Ghanim International/TAQA Transmission

Supply & Installation of DRPC at 220kV New Zakher Grid Station E4 & E
Al Ain, Abu Dhabi, United Arab Emirates
Client: L&T/TAQA Transmission

Additional 3x40MVA 132/11kV Power Transformers, Bahia 400/132kV Grid Station
Bahia, Abu Dhabi, UAE
Client: EMARAT Aloula Contracting

132/22kV Grid Station, Hudayriat Island
Hudayriat Island, Abu Dhabi, UAE
Client: ELMEC

New 132/11kV Al Sader Substation & Related 132kV Cable Works
Al Sader, Abu Dhabi, UAE
Client: EMARAT Aloula Contracting

Replacement of 3 Primary substation in Al Ain
Al Ain, Abu Dhabi, United Arab Emirates
Client: Powerlines/TAQA Distribution

Infrastructure for Residential Plots – Al Nabbagh District, Al Ain (Phase 1 & 2)
Al Nabbagh District, Al Ain, Abu Dhabi, UAE
Client: Tristar Engineering

22kV Electrical Substation, Hudayriyat Island
Hudayriyat Island, Abu Dhabi, UAE
Client: MODON Properties P.S.J.C.

11kV Substation & High Voltage Cables, Al Khaznah
Al Khaznah, Abu Dhabi, UAE
Client: MOPA

33/11kV Primary Substation, Sham Al Gharaba
Al Ain, UAE

33/11kV Primary Substation, Jabel Hafeet
Al Ain, UAE
Frequently asked questions
Which voltage levels does NCO work on?
Our portfolio includes 11kV and 22kV substations, 33/11kV primary substations, and 132kV, 220kV and 400kV grid stations in Abu Dhabi and Al Ain.
Who does NCO work for on substation projects?
Mostly the EPC and electrical contractors that build the stations for TAQA Transmission and TAQA Distribution, such as Larsen & Toubro, Al Ghanim International and EMARAT Aloula Contracting.
Does NCO handle the authority approvals?
Yes. Approvals, NOCs and stakeholder management with the utility and the authorities are part of most of our substation commissions, alongside the design.